Skip to Content

Planned Redmond road closures and delays – May 24-30

KTVZ file

REDMOND, Ore. (KTVZ) -- City of Redmond road closures can be viewed on the Redmond Area Street Closures, Events and Delays Map and ODOT TripCheck.

**NEW CLOSURES:

  • NW Hemlock Ave from NW 19th St to NW 23rd St – Closed for construction from Wednesday, May 27 thru Friday, September 4, 2020.  NW Hemlock Ave will be closed from NW 19th St to NW 23rd St while McKenzie Cascade Heavy Excavation constructs a new waterline and completes street improvements. Please use detours or an alternate route.
  • S Canal Blvd from SW Badger Ave to SW Heights Ave – Single lane closures from Wednesday, May 27 thru Monday, August 31, 2020.  S Canal will experience single lane closures from SW Badger Ave to SW Heights Ave from 7:00 a.m. to 3:30 p.m. daily while McKernan Enterprises constructs a new waterline and street improvements. Local access will be maintained. Please use caution and follow traffic control devices.
  • SW Highland Ave at SW 15th St – Traffic signal replacement on Tuesday, May 26. The City and ODOT will be installing new traffic signal controllers at SW Highland Ave at SW 15th St on Tuesday, May 26. Motorists should expect delays during the changeover and treat flashing red lights as 4-way stops.
  • SW Highland Ave at SW 9th St – Traffic Signal replacement on Wednesday, May 27. The City and ODOT will be installing new traffic signal controllers at SW Highland Ave at SW 9th St on Wednesday, May 27. Motorists should expect delays during the changeover and treat flashing red lights as 4-way stops.

ONGOING CLOSURES:

  • SW Obsidian Ave from SW 35th St to SW Helmholtz Way – Closed for construction thru Friday, July 3, 2020.
  • NW 6th St at NW Quince Ave – Single northbound lane closed for construction thru Friday, May 29, 2020.

CITY MAINTENANCE OPERATIONS:

  • SW Salmon Ave from S Canal Blvd to SW 36th Ct - Temporary single lane closures for crack sealing operations beginning on Tuesday, May 26 thru Friday, May 30 from 7:00 a.m. to 4:00 p.m. daily. Please use caution in the area and follow traffic control devices.
  • SW 6th St from SW Deschutes Ave to SW Forest Ave - Temporary single lane closures for crosswalk painting and thermoplastic installation beginning on Tuesday, May 26 thru Friday, May 30 from 7:00 a.m. to 4:00 p.m. daily. Please use caution in the area and follow traffic control devices.
  • Crack seal operations will be commencing throughout the City; activities may temporarily disrupt lanes and intersections.
  • ADA Street Improvement projects and curb ramp enhancements will be occurring at local intersections; activities may temporarily disrupt lanes and intersections. 

NOTE - During street maintenance operations, closure durations and disruptions are determined by progress of the operation and weather conditions.

Your Tax Dollars at Work: City of Redmond invests $1.5 million annually to keep Redmond’s streets smooth, clean, and safe.

Article Topic Follows: Community Billboard

Jump to comments ↓

KTVZ news sources

BE PART OF THE CONVERSATION

KTVZ NewsChannel 21 is committed to providing a forum for civil and constructive conversation.

Please keep your comments respectful and relevant. You can review our Community Guidelines by clicking here

If you would like to share a story idea, please submit it here.

Skip to content