Skip to Content

ODOT Region 4 construction update: Week of March 31-April 7

ODOT

BEND, Ore. (KTVZ) -- Here is the ODOT Region 4 construction update for the week of March 31-April 7.

Here at ODOT, we are committed to providing a safe and efficient transportation system for everyone. We invest in Oregon's future through roadway improvement projects. The following projects are located within Region 4; Central Oregon from The Dalles to Klamath Falls on the east side of the Cascades.

There are two ways to learn about construction taking place for the upcoming week. 

1. Visit TripCheck.com. Constantly updated with construction and crash data, TripCheck is the best way to learn about road conditions around the state. Click on a traffic cone symbol on the map to see construction impacts for that area.

2. Scroll down to the counties and highways listed below to see impacts that could affect you.

Construction information is shown for one week, giving you the most up-to-date information.


HARNEY/LAKE COUNTIES

U.S. 395: Big Stick to Alkali Lake, Lakeview, Lakeview-Burns Highway (MP 15.43 - MP 46.93).

No work expected this week. 

More project information here. 

DESCHUTES COUNTY

U.S. 97 and U.S. 20 Bend North Corridor 

Crews will performing excavation, embankment, drainage, and electrical underground at U.S. 20/ west side of Cooley Roundabout. The West leg of Cooley Road remains closed at U.S. 20.
Crews will be performing excavation operations off the shoulder of westbound U.S. 20 from Robal to Cooley Road.

Crews will be performing sewer line installation on Nels Anderson just north of Brandis Court under one lane, two-way flagging closures Monday 4/3 thru Friday 4/7.

More project information here.

U.S. 20: Mervin Sampels to Greenwood (3rd Street Bend, MP 18.99 – MP 20.99)

Crews will be performing lane closures on 3rd Street from Butler Market to Mervin Sampels with day and night work Monday to Friday for sidewalk and signal work.
Intersection works at Butler Market / Mt Washington are expected to impact traffic with night work scheduled for Thursday 7pm to 7am. Consider alternate routes.
Intersection works at Mervin Samples are to be flagged with one lane during the day with night work scheduled for Wednesday 7pm to 7am. Minor delays are expected.
Expected project completion November 2023.

More project information here.

U.S. 20: Tumalo-Cooley 

Crews will be performing lane closures on U.S. 20 from Tumalo to Cooley Rd with day work Monday to Friday for roundabout and structure works.
At Old Bend Redmond the south leg to O.B. Riley remains closed and paving operations will occur. In Tumalo, work will occur on the trail undercrossing, Cook Avenue, and at the Deschutes River bridge. Moderate delays are expected.

Expected project completion November 2023.

More project information here.

HOOD RIVER COUNTY

I-84: Forest Lane Over I-84 Project, Columbia River Highway (MP 46.2 - MP 46.51).

Contract work is substantially complete. No work expected this week.

More project information here.

I-84: Columbia River Highway Culverts

This project has been completed and this will be the last entry on the weekly reports.

Expected completion - March 2023.

More project information here.

HOOD RIVER COUNTY

U.S. 30: Cascade Ave @ Rand Road (Hood River) 

Crews will continue working behind the sidewalk in the NE corner of the intersection doing storm drain installation during daytime hours. No impacts to vehicular or pedestrian/bike traffic. No pedestrian detours will be in-place. No flagging or lane closures are expected for the week, but travelers should expect minimal delays and use caution while traveling through the project. 

Expected completion - May 2024.

More project information here

JEFFERSON COUNTY
and CTWS RESERVATION

U.S. 97: The Dalles - California Highway Culverts Project 

No work expected this week.

KLAMATH COUNTY

OR 140 Brett Way Extension (South Klamath Falls Highway, MP 3.74 - 4.75)

No work expected this week. 

More project information here.

OR 140 at OR 66 Intersection Improvements Project 

Earthwork, signal, pipe, and survey work. Expect Minor delays. Balsam Drive is closed at the OR 66 intersection, use signed detour route.

More project information here

U.S. 97: OR 58 - California Border Project (The Dalles - California Highway, MP 252.44 - MP 278.81)

Bridge work on USBR Bridge at MP 273.71, Link River Bridge at MP 275.03, and the Green Spring Bridge at MP 277.12.
USBR Bridge at MP 273.71: Bridge work will be done under the bridge, no delays expected.
Link River Bridge at MP 275.03: Lane shift traffic control installed on Main Street, bridge work will be done behind the barrier, no delays expected. Conger Avenue is closed for thru traffic, detour in place.
OR140 at the Green Springs Bridge: Lane shift traffic control installed, bridge work will be done behind the barrier, no delays expected.

More project information here.  

WASCO COUNTY (OR)/KLICKITAT (WA)

The Dalles (Columbia River) Bridge Project (U.S. 197: WA MP 0.57 I-84: MP 100.6-U.S. 197:OR  MP 0.61 I-84: MP 102.2.)

Work continues to occur on the shoulders and staging areas off the ends of the bridge during daytime hours with no impacts to traffic, as well as on the bridge deck, sidewalks and under the bridge. Single lane closures controlled by flaggers will occur during weeknights between the hours of 8 pm and 6 am. Travelers should expect less than 20-minute delays during night-time single lane closures. A speed reduction to 35 mph is in place across the bridge. Use caution when traveling through the project. 

Anticipated completion - April 2023.

More project information here.

Watch a video on this project here. 

 Questions or comments?

Meghan Blyth, ODOT Community Affairs Coordinator 

(541)280-2716 or Meghan.Blyth@odot.oregon.gov

For current road and weather conditions visit TripCheck.com or call 511

Article Topic Follows: Community Billboard

Jump to comments ↓

KTVZ News Sources

BE PART OF THE CONVERSATION

KTVZ NewsChannel 21 is committed to providing a forum for civil and constructive conversation.

Please keep your comments respectful and relevant. You can review our Community Guidelines by clicking here

If you would like to share a story idea, please submit it here.

Skip to content