Redmond weekly road construction update: May 21-25
Here is the city of Redmond’s road closures and delays weekly update for May 21-25:
Street Maintenance Projects:
Monday, May 21 – SW 31st St. from Highland Ave. to SW Obsidian Ave. will be closed for paving with flagging operations starting at 7:00 a.m. to finish.
Tuesday, May 22 – SW 27th St. from Highland Ave. to SW Obsidian Ave. will be closed for paving with flagging operations 7:00 a.m. to finish.
Lane disruptions on SW 6th St at Deschutes Ave. for the installation of the quiet street bike crossing MMA green
Wednesday, May 23 – Lane disruptions on SW 6th St. at Deschutes Ave. for the installation of the quiet street bike crossing MMA green
Special Event Closures:
None
Ongoing Closures:
Historic Redmond Hotel Renovation Project –
Monday, May 7 thru August 31 – from 6:00 a.m. to 10:00 a.m. Righthand lane of SW 6th St. to be partially closed from midblock between SW Deschutes Ave. and SW Forest Ave. to midblock between SW Evergreen Ave. and SW Forest Ave. The 6th St. sidewalk from SW Evergreen Ave. south to midblock will also be closed during the lane closure.
Monday, May 7 thru August 31 – from 6:00 a.m. to 3:30 p.m. Alley behind the Historic Redmond Hotel between SW 6th St. and SW 7th St. and between SW Evergreen Ave. and SW Forest Ave.
All businesses will remain open during this closure. *Activities resulting in noise will not begin until 7:00 a.m.*
South Canal Improvement Project – South Canal Blvd is closed between Wickiup Ave. and the Yew Avenue roundabout for the next few weeks. Local access is permitted. The intersection of South Canal Blvd and Wickiup Ave. will remain closed to traffic.
Scheduled Activities for the week of 5/21/2018 – 5/25/2018:
— Excavation/construct subgrade of road footprint.
— 8-inch storm system (8-inch storm pipe, drywells, & sedimentation manholes).
— Water line tie-in @ SW Canal Blvd & SW Wickiup Ave. planned for 5/21/2018.
o Eight water services and connections.
— Water line tie-in @ SW Canal Blvd & SW 27th St/Yew Ave. (roundabout) planned for 5/22/2018
o Ten water services and connections.
— Removal of existing 6-inch water line along SW Canal Blvd from SW Wickiup Ave. to roundabout.
— The intersection of South Canal Blvd and Wickiup Ave. will remain closed to traffic. Expect to see crews working between Wickiup Ave. and the roundabout on South Canal Blvd through July 2018.
Rebuilding the street will take 13 months, with project completion set for April 2019. Sections of South Canal Blvd will be closed temporarily during construction, but local access to area homes and businesses will remain open. Weekly project updates can be found online at https://www.southcanalblvd.org/.
Residents may call the Construction Hotline for more information or to report a concern at 541-579-2233.
ALL work schedules are subject to change, dependent on weather conditions and other factors