ODOT Region 4 construction update: Week of Sept. 17
Here is ODOT’s Region 4 construction update for the week of Sept. 17:
The Oregon Department of Transportation is committed to providing a safe, efficient transportation system. ODOT invests in Oregon’s future through roadway improvement projects. The following projects are located in ODOT’s Region 4 encompassing Central Oregon from The Dalles to Klamath Falls on the east side of the Cascades.
All work is dependent on weather conditions and schedules are subject to change.
Where traffic is routed through or around a work zone, pedestrians, including those with disabilities, will also be provided alternate routes through the work zone.
Crook County
OR 126 @ Tom McCall Roundabout (Prineville) – Alex Hodge Construction ill be installing light poles and performing miscellaneous work throughout the project. No traffic impacts are expected.
Deschutes County
US 97: Sunriver Interchange to OR 31 (La Pine) – Roy Houck Construction will be installing light poles and landscaping on US 97 in La Pine. There will be shoulder closures and slow traffic. The Contractor will also be grinding and paving at night on US97 between Sunriver and La Pine, and possibly in La Pine, with one-way traffic with flaggers and pilot cars between 6 pm and 7 am, with traffic delays of up to 20 minutes.
US 20: Jack Lake Road to Pine Street (Sisters) – Oregon Mainline Paving will continue installing minor safety features and performing corrective work. There may be shoulder work during the day. No traffic impacts are are anticipated.
Jefferson County
US 97: US 26 Jct. to NW 10th Street (Madras – Terrebonne) – Knife River is complete except for corrective work. There may be passing lanes closed at the Crooked River Bridge, as well as shoulder work during the day.
US 97: Spanish Hollow Creek & Trout Creek Bridges – Stellar J Corporation is performing bridge replacement work. Traffic is reduced to a single lane through the work zone and is controlled by temporary signals, minor delays anticipated. Occasional flagger controlled one-way traffic may be required.
Klamath County
OR 140: Buck Creek Bridge – Marcum & Sons Construction is replacing the Buck Creek Bridge (MP 22). Traffic will be controlled by a temporary signal and limited to a single lane. Work will take place Monday through Friday during daytime hours. Drivers can expect delays up to 10 minutes.
OR 140: Brown Creek (Beatty) – La Duke Construction will be completing survey and earthwork. A temporary signal will be installed this week. Expect delays up to 15 minutes.
OR 140: Greensprings Interchange to Klamath Falls/Malin Hwy – Rocky Mountain Construction will be completing sidewalk and shoulder work during the day. Minor delays are expected.
US 97: Algoma Road to Miller Island Road – Rocky Mountain Construction will be on site completing night paving work from 7pm to 7am Sunday night through Friday morning. The work zone is controlled with flaggers and pilot cars. Expect delays up to 20 minutes.
US 97: Spring Creek Hill to Modoc Point – Rocky Mountain Construction will be on site completing night work from 7pm to 7am Sunday night through Friday morning. The work zone is controlled with flaggers and pilot cars, expect 20 minute delays.
Lake County
US 395: South Fork Crane Creek – No on site work expected.
OR 140: Antelope Creek to Odegaard Road – LaDuke Construction will be on site completing shoulder work. Expect minor delays.
Sherman County
US 97: Spanish Hollow Creek & Trout Creek Bridges
US 97 at MP 0.4 – Stellar J Corporation is completing bridge removal, pile driving, and the first stage of bridge construction. One way traffic will be controlled continuously by a temporary signal. Occasional flagger controlled one-way traffic may be required. US 97 at MP 3.1 and 3.2 – Stellar J Corporation is completing seismic retrofit substructure work. Occasional flagger controlled one-way traffic may be required.Expect minimal Delays. US 97: Shaniko to Trout Creek – High Desert Aggregate and Paving will not be on site this week. Expect no delays.
Wasco County
I-84: Hood River to Tower Road – Oregon Mainline Paving will not be onsite this week. Expect no delays.
Various
Region 4 Curve Warning Signs – Baker Rock Resources will be installing signs on the Shaniko to Fossil Highways (OR 218). Traffic can expect one-way traffic with flaggers and delays of up to 20 minutes.