Bend road and traffic report: Week of May 6-10:
Here’s the city of Bend’s Road and Traffic report for the week of May 6-10:
· SW Bond Street between SE Wilson Avenue and SW Upper Terrace Drive infrastructure installation, road closure with detour, 5/6/19 – 5/17/19
· NE Jones Road between NE Watson and NE Dempsey for asphalt replacement, road closure with detour, 5/6/19 – 5/9/19, 7 a.m. – 4 p.m.
· NE 6th Street at NE Seward Avenue and at NE Norton Avenue is closed for concrete traffic circle construction until 5/10/19. Signed detours are provided around both intersection closures.
· NE Revere Avenue will have day time flagging at NE 6th Street for curb ramp construction. Expect delays on Revere between 4th and 8th Streets 7 a.m. to 5 p.m. 5/6/19 – 5/10/19.
Ongoing Closures:
· NE 6 th Street between NE Greenwood Avenue (US Hwy 20) and NE Majesty Lane for asphalt speed hump installation, pavement markings, and concrete work at several intersections, rolling one block closures and detours along with day time flagging, 4/29/19 – 6/15/19.
· SE Airpark Drive between SE Soft Tail Loop and Thomas Drive for waterline installation, road closure with detours, 4/29/19 – 5/14/19.
· O.B. Riley Road between Mathers Road and Cooley Road for infrastructure installation, road closure with detour, until 5/10/19.
· Brosterhous Road between American Lane and Jacklight Lane for sewer main installation, southbound lane closures with detours, until 7/15/19.
Upcoming Closures:
· Roundabout at intersection of NW Shevlin Park Road and NW Mt. Washington Drive for roundabout reconstruction, road closure with detours, 5/13/19 – 6/27/19.
· SE Cessna Drive between SE Piper Drive and SE Craven Road for waterline installation, road closure with detour, 5/20/19 – 6/6/19.
· The intersection of Empire Avenue and Purcell Boulevard will be closed to complete the construction of a new roundabout at this intersection. The closure will begin on Monday, June 17th and will last approximately 8 weeks. Access to Terrango Glen and Lava Ridges neighborhoods will be maintained during construction. Detours will be signed and a map showing these detours will be issued in future outreach efforts. Please be aware of construction speed limit changes in this area.
· Fred Meyers Road between Boyd Acres Road and Vogt Road for milling and paving, road closure with local access only, 5/13/19 – 5/15/19.
· NE Madison Avenue between NE Butler Market Road and NE Veronica Lane for milling and paving, road closure with local access only, 5/13/19 – 5/15/19.
· NW Greeley Avenue between NW Harriman Street and Bend Parkway for milling and paving, road closure with local access only, 5/14/19 – 5/16/19.
· NW Irving Avenue between NW Oregon Avenue and Bend Parkway for milling and paving, road closure with local access only, 5/14/19 – 5/16/19.
· McClellan Road west of Brookswood Boulevard for milling and paving, road closure with local access only, 5/15/19 – 5/17/19.
· NE 2 nd Street between NE Burnside Avenue and NE Quimby Avenue for milling, road closure with local access only, 5/16/19.
· NW Twilight Drive, NW Nightfall Circle, Sample Court, NW Keenan Court, and NW Fitzgerald Court for milling, road closure with local access only, 5/17/19.
Work schedules are dependent on weather conditions and other factors.