Deschutes County road construction update: Week of Dec. 4-10
BEND, Ore. (KTVZ) -- Here is Deschutes County's road construction update for the week of Dec. 4-10.
Stevens Rd Sewer Line Installation (Bend Area) – Installation of a sewer line crossing will be occurring on Stevens Road between SE 27th Street and Ward Road.
Traffic Information – Stevens Road will remain closed to public traffic between SE 27th Street and Ward Road through Dec. 23. A designated detour route is in place via Bear Creek Road. Access for local traffic will be maintained during construction.
U.S. Highway 20: Tumalo-Cooley Project (Bend Area) – Utility work, paving, and earthwork will be occurring in the vicinity of the U.S. 20-Old Bend Redmond Highway intersection.
Traffic Information – Old Bend Redmond Highway will remain closed to traffic between U.S. 20 and Sunset Drive through Dec. 31. Sunset Drive will also remain closed at the intersection with Old Bend Redmond Highway. A designated detour route is in place via O.B. Riley Road and Cooley Road.
Wastewater Transmission Pipeline (La Pine Area) – Installation of a sewer pipeline will be occurring along Rosland Road between Drafter Road and Darlene Road.
Traffic Information – Road users should expect single lane closures facilitated by flaggers and delays of up to 20 minutes during work hours.
*** Note that work hours are subject to change based on weather conditions. ***
FOR MORE INFORMATION
Visit: deschutescounty.gov or TripCheck.com
Contact: Deschutes County Road Department at (541) 388-6581