ODOT Region 4 construction update: Week of May 21
Here is ODOT’s weekly Region 4 construction update for the week of May 21:
The Oregon Department of Transportation is committed to providing a safe, efficient transportation system. ODOT invests in Oregon’s future through roadway improvement projects. The following projects are located in ODOT’s Region 4 encompassing Central Oregon from The Dalles to Klamath Falls on the east side of the Cascades.
All work is dependent on weather conditions and schedules are subject to change.
Where traffic is routed through or around a work zone, pedestrians, including those with disabilities, will also be provided alternate routes through the work zone.
Crook County
OR 126 @ Tom McCall Roundabout – Alex Hodge Construction plans to finish grading rock and pave at the roundabout and on the new alignment of Tom McCall Rd north of Hwy 126. No traffic impacts are anticipated.
Deschutes County
US 20: Powell Butte Highway to Horse Ridge Frontage Road – High Desert Aggregate and Paving will be installing striping, signs, and other safety features. There may be one-way traffic with flaggers and pilot cars between 7 am and 8 pm, and delays of up to 20 minutes.
US 20: Suttle Lake to Santiam Junction – Knife River will be installing and modifying outfalls, and installing signs. There may be one-way traffic with flaggers and a pilot car during the day Monday to Thursday and until noon on Friday.
US 20 @ Barclay Drive – Knife River will be constructing a trail along US 20 southeast of the roundabout. Minimal traffic impacts are expected.
Jefferson County
US 97: US 26 Jct. to NW 10th Street (Madras – Terrebonne) – Knife River will be installing and modifying outfalls, and installing signs. There may be one-way traffic with flaggers and a pilot car during the day Monday to Thursday and until noon on Friday.
US 97: Spanish Hollow Creek & Trout Creek Bridges – Stellar J Construction is completing utility work and the bridge demolition containment structure at Trout Creek Bridge (MP 75). There may be one-way traffic with flaggers Sunday through Saturday anytime.
Klamath County
US 97 Link River Bridge Northbound Connection – The US 97 Link River Bridge northbound off-ramp is closed for repairs through May 31st. Crews are working to replace the existing concrete bridge deck. During construction, US 97 traffic will be detoured to the north and can reach the City Center via the Crater Lake Parkway/Esplanade/Main Street exit. Detour routes will be signed accordingly.
OR 140: Buck Creek Bridge – Marcum & Sons Construction is beginning work to replace the Buck Creek Bridge (MP 22). Traffic will be controlled by a temporary signal and limited to a single lane. Work will take place Monday through Friday during daytime hours. Drivers can expect delays up to 10 minutes.
OR 240: Greensprings Interchange to Klamath Falls/Malin Hwy – Rocky Mountain Construction will be completing shoulder work and installing signs. Minor delays are expected.
US 97: Algoma Road to Miller Island Road – Rocky Mountain Construction will be completing minor should work to remove concrete barrier between MP 265.5 – 267.5. Work will take place at night Sunday through Thursday from 7pm to 7am. Expect delays up to 20 minutes.
Lake County
OR 140: Antelope Canyon to Odegaard Road – LaDuke Construction will be completing minor shoulder work. No delays are expected.
Sherman County
US 97: Spanish Hollow Creek & Trout Creek Bridges – Stellar J Construction is completing drilled shaft construction access on US 97 over Spanish Hollow Creek. There may be one-way traffic with flaggers Sunday through Saturday anytime.
Wasco County
I-84: Hood River to Tower Road – Oregon Mainline Paving will have the fast lanes closed both in directions. The lane closures will be inplace each night, Sunday through Friday morning between MP 76 and MP 68. Later in the week the contractor will switch the lane closure to the WB slow lane and the lane closure will be in place each night between MP 69 and MP 64. The ramps (exit 69) for the City of Mosier will be closed on May 22nd, 23rd from 10pm-5am for Rock Creek Bridge Deck Repair.
Wheeler County
Fossil Heritage Trail – Construction will take place Monday through Friday during daytime hours. The contractor may hold traffic on flagging operations for up to 20 minutes. Use alternate routes and expect delays when traveling through the listed areas of construction.
Various
Region 4 Curve Warning Signs – Baker Rock Resources will be performing survey work and installing bases on the Wasco Heppner Hwy (OR 206) and John Day Hwy (OR 19). There may be one-way traffic with flaggers and delays of up to 20 minutes.