Skip to Content

ODOT Region 4 construction report: Week of May 17-21

ODOT

BEND, Ore. (KTVZ) -- Here is the ODOT Region 4 construction report for the week of May 17-21:

The Oregon Department of Transportation is committed to providing a safe, efficient transportation system. ODOT invests in Oregon's future through roadway improvement projects. The following projects are located within ODOT's Region 4 encompassing Central Oregon from The Dalles to Klamath Falls on the east side of the Cascades.

All work is dependent on weather conditions, and schedules are subject to change.

Deschutes County

U.S. 97: S Century Drive to USFS border (MP 153.11-MP 156.26)Contractor will be performing earthwork activities and bridge work for the new northbound alignment. No delays to traffic are anticipated.

U.S. 97: Nels Anderson Place-Romaine Village Way (Bend Parkway Repaving)

Monday night, May 17, the contractor will perform Stage 1 Phase 2 SB Closure: US97 Southbound will be closed from Exit 139 (Reed Market Rd) to Exit 141 (Murphy Rd). All SB traffic will be diverted onto US97 Business route (3rd. St.) and will be detoured south to Murphy Rd where travelers will be able to regain access to US97 by way of the US97 SB on-ramp at Murphy Rd.
Tuesday night, May 18, the contractor will perform Stage 2 Phase 1 NB Closure: US97 Northbound will be closed from Exit 141 (Murphy Rd.) to Exit 139 (Reed Market Rd.). All NB traffic will be diverted onto US97 Business route (3rd.St.) and will be detoured north to Reed Market Rd. where travelers will be able to regain access to US97 by way of US97 NB on-ramp at Reed Market Rd.
Wednesday night, May 19, the contractor will perform Stage 2 Phase 2 NB Closure: US97 Northbound will be closed from Exit 139 (Reed Market Rd.) to Exit 135B (Empire Ave.). All NB Traffic will be diverted onto US97 Business route (3rd. St.) and will be detoured north to Empire Ave. where travelers will be able to regain access to US97 by way of US97 NB on-ramp at Empire Ave.

ALL CLOSURES AND WORK WILL OCCUR BETWEEN 8 p.m. – 6 a.m.

For more information, including detour maps, please visit the project website.

Harney/Lake counties

US395: Big Stick – Alkali Lake, Lakeview, Lakeview-Burns Highway (MP 15.43- MP46.93. Survey, roadway grading and paving work is scheduled; work zone will be a 24-hour flagging and pilot car operation. Expect 20-minute delays.

Hood River County

I-84: Hood River Eastbound & Westbound Bridges project, I-84 (MP 63.9-64.42) Contractor will install fall protection, replace guardrail and perform temporary paving. Watch for crews working behind barriers and under the bridge deck. Traffic is 2 lanes westbound, and 1 lane eastbound. Speed reduction is in place at 50 mph throughout the work zone.

For more information, please visit the project project website.

Jefferson County
and CTWS Reservation

U.S. 26: Warm Springs Safety Corridor, (MP 103.02-MP111.16). The contractor will perform excavation and earthwork activities. The highway will be reduced to one travel lane that will be controlled by flaggers and a pilot car. Traffic can expect delays of up to 20 minutes.

Klamath County

OR39: Crest St. - Madison St., Klamath Falls, MP2.99-MP4.26) Survey, excavation, sidewalk, and signal work is scheduled during the day and night Sunday through Friday. Expect minor delays.

OR140 Brett Way Extension (South Klamath Falls Highway, MP3.74-4.75) Survey and excavation work is scheduled to begin. Expect minor delays.

US395 & OR140 (Lakeview) ADA Curb Ramps (MP 142.62-MP 144.06) Temporary signing should begin the week of May 3, and onsite demo work and ramp construction the week of May 10.

Sherman County

U.S. 97: Rockfall Project (U.S. 97/Sherman Highway milepost 0.87-3.69) Material removal, access road creation and drilling are occurring throughout the project area. Watch for rocks in roadway. Flaggers are moving traffic through the work zone during the daytime, expect 20 minute delays. Blasting will occur at milepost 3.3 and 3.2 on Tuesday and Wednesday, with delays of 20 minutes or less.

Wasco County (OR)/Klickitat (WA)

The Dalles (Columbia River) Bridge Project (U.S. 197 (WA) milepost 0.57-OR milepost 0.61-I-84 (OR) milepost 100.6-102.2). Traffic is routed to a single lane detour next to the existing bridge, and controlled by a traffic signal. Blasting may occur at quarry site between milepoints 59 to 60, with flaggers potentially stopping traffic up to 20 min.

Wheeler County

U.S.26: Bridge Creek Bridge Project (U.S. 26/Ochoco Highway, milepost 64.91-65.19) Crew will start demolishing existing bridge. Construction crews will be working overnight; expect delays up to 20 minutes during nighttime hours while flaggers control traffic across the bridge. The majority of work will occur under the bridge and includes installation of scaffolding. Crews will also continue forming new concrete panels at their pre-cast yard location.

Article Topic Follows: Community Billboard

Jump to comments ↓

KTVZ news sources

BE PART OF THE CONVERSATION

KTVZ NewsChannel 21 is committed to providing a forum for civil and constructive conversation.

Please keep your comments respectful and relevant. You can review our Community Guidelines by clicking here

If you would like to share a story idea, please submit it here.

Skip to content