Deschutes River Trail boardwalk upgrades at Drake Park taking longer than expected
The new boardwalk at Drake Park was expected to be finished by the end of July, but is now pushed back to late August. It will connect the Deschutes River Trail from Drake Park in downtown Bend to Pacific Park.